Location
Staffelstrasse, Edenstrasse, Rüdigerstrasse
Useable area
ca. 44’500 m²
Primary use
Residential and commercial
Project period
2002-2018
Architecture
Philipp Wieting Werknetz Architektur, Zürich
Landscape architecture
Müller Illien Landscape Architects, Zurich
Special features
From a purely industrial site to a vibrant, mixed-used district.
Background
Boosted by the construction of the Sihltal Railway and Giesshübel station, a new neighbourhood began to take shape from the 1890s onwards in the area between the railway tracks, the River Sihl and Giesshübelstrasse. In the front section, the Phoenix building company primarily constructed residential buildings, whilst industrial and commercial buildings were erected in the rear section. Particularly striking is the curved building at Staffelstrasse 8 to 12, the oldest part of which dates back to the 1920s. For decades, this was the headquarters of Jean Frey’s publishing house and printing works. In addition to Frey’s *Sport*, Ringier’s *Blick* also had its editorial offices here for a time. Architecturally remarkable and listed in the heritage register is the former Philips building, designed by architect André E. Bosshard and built in 1957–58 at Edenstrasse 20. Notable features include the wraparound windows and the pleated parapet bands, the vertical emphasis on the corners, and the imposing concrete stele that once bore the company logo and marked the entrance. Following Jean Frey’s departure, the publishing and printing building was marketed as the ‘Phönix site’.
Initial Situation and Objectives
Intershop acquired the complex in 1998, which included further commercial buildings on Rüdigerstrasse and Staffelstrasse. Under the name ‘Edentown’, the plan was to transform the commercially used site into a mixed-use neighbourhood with homes and workplaces that would integrate into the surrounding urban fabric. The aim was to preserve the large, striking office and commercial buildings and adapt them to modern requirements. Other buildings, however, which were less suitable for conversion – particularly for residential purposes – were to be replaced by new developments. This allowed the site to undergo densification towards the centre.
Transformation
The project began with the refurbishment of the commercial building at Staffelstrasse 8 to 12. Contemporary office and commercial spaces were created within this distinctive building. From 2007 onwards, three new buildings comprising a total of 140 commonhold apartments were constructed according to plans by Philipp Wieting’s practice Werknetz Architektur: Edeneins (completed in 2008) is a two-part building with a central courtyard; Edendrei (2010), situated alongside the railway tracks, echoes the design of the existing commercial building; and Edenfünf (2012) replaces an older commercial building dating from the 1940s. Edensieben, with flats and studios at the heart of the site, marked the completion of the transformation in 2018. The former Philips building was thoroughly refurbished by 2015 in line with current technical requirements and with due regard for heritage conservation considerations. It was certified with the LEED Platinum label and granted permanent listed status.
Result
The four new residential blocks, comprising almost 160 flats, breathe new life into the former industrial site and ensure a balanced mix of different uses – precisely what defines a contemporary city. The residential use that the Phoenix building company introduced to the edge of the neighbourhood with its buildings over a hundred years ago is now also making its way into the heart of the area. With their scale and character, the new buildings blend seamlessly into the existing fabric and build upon it. The two refurbished commercial buildings continue the site’s history in a contemporary way. The SZU’s Giesshübel station connects the complex to the city centre and the Sihltal valley, whilst footpaths link it to local recreational areas and shopping and leisure facilities.
“Careful modernisation and additional new builds that draw on the design language of the retained structures, preserve existing resources and create a harmonious, dynamic site.”
Markus Lisibach
Project Manager
Location
Type of Use
| TYPE | PROPORTION |
|---|---|
|
Apartments
|
90% |
|
Warehouses
|
10% |
|
Lettable area
|
100% |
|
Parking spaces (number)
|
65 |
Creating added value while achieving sustainability goals
Converting the office blocks to residential accommodation has helped to create an inclusive and sustainable urban environment where people enjoy living and working.
The existing supporting structure was retained and grey energy reduced by taking a resource-conserving approach to construction.
A LEED Platinum certified full renovation, carried out in compliance with heritage preservation requirements, significantly reduces the energy consumption and greenhouse gas emissions of the site.
The native plant-life added to the exteriors encourages biodiversity and integrates the Limmat river’s wooded banks into the project.
Contact
Mireille Lehmann