Basel, Reding-/Lehenmattstrasse

A visionary building project

Location

Redingstrasse 10-14/20-24, Lehenmattstrasse 260

Useable area

ca. 26’000 m²

Primary use

Residential, public services

Project period

2020-2024

Architecture

Morger Partner Architekten AG, Basel

Landscape architecture

Westpol, Basel

Special features

Redensification of a high-rise site to create a modern residential complex closed to nature.

Bird's eye view of the apartment blocks

Background

In March 1960, the long-established Basel silk ribbon weaving mill De Bary & Co. ceased operations and became a property company. In the same year, construction began on the factory site by the St. Alban Pond – a commercial canal dating back to the Middle Ages – on a housing estate comprising four 18-storey tower blocks and six 3-storey low-rise buildings. In 1962, half of the development, designed by the architectural firm Suter+Suter, was completed; the second phase followed between 1967 and 1969. Sociological findings led to adjustments being made to the mix of flats during the second construction phase. Too many small flats would exacerbate the ‘agglomeration problem’, whilst too many large flats would be difficult to let. ‘The middle ground creates clear sociological conditions,’ was the conclusion. Whilst the first two high-rise blocks were dominated by 1½- and 2½-room flats, the focus in the other two was on 2- and 3½-room flats. This strategy was clearly successful, as the high-rise estate never became a social trouble spot; many elderly people have lived here for decades.

Initial Situation and Objectives

Today, three owners share the development, with Intershop’s share comprising two high-rise blocks and three low-rise buildings. In 2010, Intershop approached the other two owners and the City of Basel to explore the possibilities for careful redensification and regeneration of the site. The aim was to make a substantial contribution to sustainable inner-city densification. The valuable development, listed in the Inventory of Swiss Heritage Sites (ISOS), was to be preserved, and the ensemble effect – which contributes significantly to the neighbourhood’s identity – was to be maintained.

Transformation

In a feasibility study, Morger Partner Architekten (then Morger Dettli) assessed the potential of the housing estate. This was followed, between 2012 and 2015, by the preliminary design and the planning framework, including a new development plan. In stages, the existing high-rise blocks were each supplemented, on one of the closed end façades, with an additional high-rise building on an approximately square floor plan. Each floor contains two to three flats. The slightly greater floor-to-ceiling heights meant that the new buildings comprise 16 storeys instead of 17. At the same time, the existing high-rise blocks were refurbished. Care was taken to minimise disruption to the building as much as possible, so that tenants could remain in their flats throughout the construction process. In terms of design, the architects took their cue from the existing buildings, which are characterised by light-coloured parapet bands, balcony balustrades made of green glass, dark steel profiles and orange awnings. Intershop also developed the three low-rise buildings and subsequently sold them as properties in commonhold. As the final stage, the Lehenmatt Ensemble building was completed in 2024 on the corner of Lehenmattstrasse and Redingstrasse. It was built on the site of the former neighbourhood centre and, once again, comprises shops and other communal facilities.

Result

The refurbishment and extension have preserved the distinctive character of the housing estate at St Alban’s Pond and safeguarded it for the future. A diverse range of flat layouts, complemented by new options, ensures a good mix of residents. Thanks to the refurbishment being carried out whilst the estate remained occupied, the social fabric of the community has also been maintained. The park-like character of the surroundings has been preserved and enhanced. The new buildings, which nestle against the high-rise blocks, blend seamlessly with the existing development – anyone unfamiliar with the estate beforehand would only distinguish between old and new at second glance. The new buildings, whose varying storey heights are barely noticeable, create new visual connections with their three-sided orientation and lend the four high-rise blocks an additional sense of dynamism. The new Lehenmatt Ensemble makes a contemporary statement, ensures local amenities and anchors the estate within the neighbourhood.

Portrait: Mireille Lehmann

“For us, densification means thinking more about what’s already in place – being respectful, conserving resources, and taking into account the quality of life of the people who live on the estate now and in the future.”

Mireille Lehmann

Head of Construction and Development

Location

Type of use

TYPE PROPORTION
Apartments
93%
Retail
4%
Commercial
2%
Warehouses
1%
Lettable area
100%
Parking spaces
289
Your browser does not support the HTML5 canvas element.

Creating added value while achieving sustainability goals

Icon - Sustainable Cities And Communities

Careful redensification of the slab buildings built in the 1960s made it possible to create 168 additional apartments. The newly designed outdoor space offers tenants and the local population a place to relax.

Icon - Responsible Consumption And Production

A resource-saving approach was pursued by preserving the existing supporting structure and reducing grey energy.

Icon - Climate Action

The SNBS Gold-certified extension and the energy-efficient renovation of the existing buildings have significantly reduced greenhouse gas emissions in the area.

Icon - Life on Land

The outdoor space design with native plants promotes flora and fauna in the urban environment.