Baden, Römertrasse 36

A quality living environment rather than a dreary office

Location

Römerstrasse, Baden

Useable area

ca. 9’200 m²

Primary use

Residential

Project period

2020-2023

Architecure

Michael Meier and Marius Hug Architekten AG, Zurich

Landscape architecture

Müller Illien Landscape Architects, Zurich

Special features

Conversion of offices into flats and densification through a design plan procedure.

Bird’s-eye view of four white residential blocks with solar panels next to a river

Background

In the early 1960s, the then Brown, Boveri & Cie. (now ABB) constructed four three-storey office pavilions on Römerstrasse. The elongated plot, bordering directly on the River Limmat, had previously been the site of the former villa of Charles Eugene Lancelot Brown. In order to create as many parking spaces as possible, the four parallel, largely identical new buildings were raised on columns above an open ground floor; further parking spaces were provided in an underground car park. The stairwells were each attached to the street-facing front façade.

Initial Situation and Objectives

In 2010, Intershop acquired the ageing buildings and explored various development options – including the option of replacing them with new buildings. However, due to the required distance from the woodland, a new building would have had to be set back a considerable distance from the edge of the slope down to the Limmat, which would have resulted in a block-like structure that the city also did not want. Intershop therefore decided to convert the four office pavilions into residential blocks with commonhold apartments and to add additional storeys. The unique location overlooking the Limmat was to be showcased to create high-quality living space. Whilst the buildings’ past as office blocks was to remain discernible, it was not to compromise the quality of living. The existing structures, comprising concrete frames and coffered ceilings, were to be retained, and the previously vacant ground floor was also to be made suitable for residential use. Ultimately, the four standalone buildings were to appear as a unified whole.

Transformation

Renovation rather than demolition, reuse, circular construction: the careful use of resources is a necessity of our times. However, realising what seemed an obvious solution required a development and planning process lasting around ten years, which ultimately enabled the rezoning on the basis of a design plan. The alterations to the building’s structure were far-reaching: the architects demolished the stairwells and extended the storeys in their place. On top of each of the existing three upper storeys, they added a fourth storey, set back from the street. To create new access routes, they cut through each building to form two new concrete cores containing staircases and a lift. Between them, on the ground floor, a path runs transversely beneath all the pavilions, connecting to the street at both ends. Flats were also built into the remaining ground-floor areas. Between the buildings, the path widens into courtyard-like green spaces, designed by the landscape architecture firm Müller Illien. The new façade retains the characteristic horizontal layering, yet the appearance of the office block has been transformed. The tight grid of the façade columns creates a finely detailed rhythm in the bands of windows. This contrasts with the wraparound parapet bands made of fibre-cement panels, which are folded out twice in a skirt-like manner. The narrow sides, which were previously closed off, now also open up to the surroundings with bands of windows.

Result

The continuous walkway links the four individual buildings into a single ensemble. The architects have named this element ‘Sotoportego’, drawing inspiration from the passageways in Venice that run beneath the houses, connecting squares and alleyways. Each stairwell provides access to two to three flats per floor. The 78 modern, energy-efficient units are all fitted with terraces or loggias. In the central section, they face east and west; at the ends of the buildings, they either offer views on three sides towards the green space above the Limmat or, at the corners, towards the city. To compensate for the lack of a view, the ground-floor flats benefit from a slightly greater ceiling height.

Markus Lisibach

“The conversion of the office buildings to modern residences blends this unique site on the Limmat into a harmonious whole with industrial character and high-quality accommodation.”

Intershop

Markus Lisibach

Location

Type of use

TYPE PROPORTION
Apartments
100%
Your browser does not support the HTML5 canvas element.

Creating added value while achieving sustainability goals

Icon - Sustainable Cities And Communities

Converting the office blocks to residential accommodation has helped to create an inclusive and sustainable urban environment where people enjoy living and working.

Icon - Responsible Consumption And Production

The existing supporting structure was retained and grey energy reduced by taking a resource-conserving approach to construction.

Icon - Climate Action

Energy system renovations (Minergie) and the installation of new photovoltaic systems are reducing the building’s energy consumption and greenhouse gas emissions.

Icon - Life on Land

The native plant-life added to the exteriors encourages biodiversity and integrates the Limmat river’s wooded banks into the project.

1

Contact

Portrait: Mireille Lehmann

Mireille Lehmann

Head of Construction and Development
+41 44 544 10 00 mireille.lehmann@intershop.ch